22 Nov - 14 Dec 2007
|
After several days of digging 25 holes
by hand in the ground, the foundations (2 x 2 x
0.5 m) were built at 1.9 m deep, together with
25 pillars on top. They were connected to each
other by 1500 big stones and covered with cement
and sand. |
|
The foundation was finished on December 5th |
|
The yellow line shows you the outer wall of the building |
|
On December 7th the workers built the
pillars and a few days later the walls with
thousands of red bricks. First the back of the building and later the two
side rooms
(2.4 x 7 m each). They will be used for kitchen
(left) and storage (right).
|
|
The land seen from the top of
Marble mountains - direction Hoi An
|
Preparing the ceiling of the first floor (Dec 14th).
At the back you can see the Mar-ble
mountains. The arrow shows the top (heaven) where we
took the picture -left.
|
|