14 Febr 2008 – 14 March 2008
|
Using bamboo construction stilts |
The first layers of plaster attached
|
At the side and back of the building
|
|
Working hard to get it all done in time |
Covered with plaster from top to bottom
|
The Solar Serve factory on the first floor
|
|
Building the construction of a hip roof and the place for a water tank and a simple hot water heater |
|
After four months of hard work |
Ready to be painted
|
Hundreds of tiles were delivered
|
|
The
2nd floor has 1 big & 3
small rooms. |
All door & window frames were attached.
|
Lots of light flowing
through the windows
|
|