SOLAR SERVE CENTER:

 

14 March – 14 April   2008

 

Working at the balcony  
Different material is used for protection
Painted with a white undercoat
A wide-angle picture of the second floor towards the front
The toilets, stairway and coffee bar at the back
The workers showed their skills when they tiled the whole building with hundreds of tiles
 
The side kitchen downstairs
The stairway to the second floor
The water container ready to be installed
 
Storing the first cookers in the factory
The new sliding door at the front
The first lights were installed – Wow!!!!