14 March – 14 April 2008
|
Working
at the balcony |
Different material is
used for protection
|
Painted with a white
undercoat
|
 
|
A wide-angle picture of the second floor towards the front |
The toilets, stairway and coffee bar at the back
|
|
|
The workers showed their skills when they tiled the whole building with hundreds of tiles |
|
The side kitchen downstairs |
The stairway to the second floor
|
The water container ready to be installed
|
|
Storing the first cookers in the factory
|
The new
sliding door at the front
|
The first lights were installed – Wow!!!!
|
|