14 April – 14 May 2008
|
Accessories for the six bathrooms |
The plumber fixing one of the six toilets
|
The ladies bathroom is almost ready
|
|
Special sheets of stone (like marble) ready to be cut and fixed on the stairs and also used on the counter at the
2nd floor |
|
Trees ready to be cut into roof rafters 5000 red roof tiles will cover the wooden frames on the roof, kitchen and storage |
|

Painting the back of the center The windows and doors will be fixed
into the wall frames soon |